Track data center projects and assess where to build
Investors use RegLayer to track data center projects and company exposure. Developers use it to evaluate sites, infrastructure and permitting requirements.

Cited on the front page of the Financial Times
RegLayer’s research on delayed data center projects featured in the lead story on October 19, 2026.
Assess a potential site before committing capital
At 205 Fry Road in Pennsylvania, explore how a recorded transmission easement affects the site, what the township’s zoning map shows, and which approvals and utility commitments still need to be confirmed.

Start with the land record
The recorded Met-Ed easement is 250 feet wide. See where the mapped transmission corridor crosses parcel 73531403244977. Check what the easement terms allow inside the corridor before relying on a site layout.
Open the recorded easement ↗Confirm the permitted use
The township map shows Fry Road in General Commercial. The data center draft we reviewed places the conditional-use route in General Industrial. The draft does not establish permission for this parcel. Get the enacted ordinance text and a written zoning determination from the township.
Open the township zoning map ↗Establish the water supply
Public water service at Fry Road is unconfirmed. Estimate demand for the first phase, then check supply options and any permits or Delaware River Basin Commission review they would require.
Review basin commission project requirements ↗Separate grid plans from a connection
Met-Ed’s nearby South Reading transformer project is a reliability upgrade. A first-power date for Fry Road still depends on a site-specific utility study, upgrade scope and service schedule.
Open the utility planning record ↗Identify the approvals and their sequence
Start with the township’s zoning route and land-development requirements. Assess applicable state and federal permits and start utility studies alongside local review.
Open the township code ↗Ground Signal
Follow planned campuses, company involvement, permit decisions and changes in project status. Open the public records behind each development.